Design, construction, supply, installation, testing and commissioning of Asqalan Substation Extension and associated Power Distribution Line.

  • 220/20 kV Voltage Rating
  • 25 MVA, 220/20 kV Transformer Bay Extension
  • 1 Incoming 220 kV
  • 4 Outgoing 20 kV Feeders
  • 32.6 km Double Circuit 20 kV Power Disturbution Line

Client:
Da Afghanistan Breshna Sherkat (DABS)

Prime Contractor:
Asist Consultants Inc. (ACI)

Novin Simia’s Role:
Subcontractor (Full EPC)